When r-a starts up, it starts switching the workspace before all vfs
events have been processed which causes us to switch workspace multiple
times until all vfs changes have been processed. This scales with the
size of the project and its dependencies. If workspace files from
dependencies as well as the sysroot get loaded, we shouldn't switch
the workspace as those have no impact on the project workspace.
The thread name is shown in debugger as well as panic messages and this
patch makes it easier to follow a thread instead of looking through
full backtrace, by naming all spawned threads according to their
functioning.
In some situations we reloaded the workspace in the tests after having reported
to be ready. There's two fixes here:
1. Add a version to the VFS config and include that version in progress reports,
so that we don't think we're done prematurely;
2. Delay status transitions until after changes are applied. Otherwise the last
change during loading can potentially trigger a workspace reload, if it contains
interesting changes.