a7387cae2c
In some situations we reloaded the workspace in the tests after having reported to be ready. There's two fixes here: 1. Add a version to the VFS config and include that version in progress reports, so that we don't think we're done prematurely; 2. Delay status transitions until after changes are applied. Otherwise the last change during loading can potentially trigger a workspace reload, if it contains interesting changes. |
||
---|---|---|
.. | ||
src | ||
Cargo.toml |